| Basin top, perimetral
edging, side finishing elements and front ledge in massive laminate
HPL mm. 14 gauge. The basin top and the front ledge have been connected by means of a special anodized profile bar. Painted steel supports fixed to the laminate sections with stainless steel self-tapping screws. Enamwled china basin. Faucets according to the customer’s requirements. All laminate panels are finished by milling them in order to obtain accident-prevention connecting parts and bevels. Laminate colour according to ARPA’s colour card. |
| Cod. S340 Basins Selene/DW Series |
![]() |
![]() |
| Cod. S341 Basins Selene/UP Series |
![]() |
![]() |