![]() |
Swimming-pool sector |
| Moveable bulkheads |
| Optional equipment and accessories |
| P170. Presetting for the installation or starting blocks |
| The moveable
bulkhead can be preset for the installation of starting blocks. The supporting structure of the walking surface is provided with four threaded pads duly sized and ready to fix the starting blocks. |
| P171. Presetting for the installation of handrails |
| The
moveable bulkhead can be preset for the installation of handrails
by inserting some fixing bases made of stainless steel AISI 316 in one of the top main beams. Each handrail is equipped with two anchoring points. If they are not being used they are finished by round stainless steel sections, screwed to the anchoring points. |
| P172. Handrails |
| If
preset, the moveable bulkhead can be equipped with handrails made
of bent tubular stainless steel sections AISI 316. To install the handrails just insert the handrail uprights in the preset bases. |
![]() |
| P173. Closing panels |
| If necessary the moveable bulkhead can be equipped with closing panels made of 5 mm thick laminate. The panels have an accident prevention function. |
| P174. Shifting device |
| The
bulkhead can be equipped with a tranfer device including a lever
to be inserted in the relevant seat on each side of the bulkhead.
It should be used as shown in the picture to shift the bulkhead
with minimum effort and max precision. After use the lever can be removed by making the access free to the bulk head walking top. Two operators shall cooperate for shifting the bulkhead. |
![]() |